Budget Allocation
Testing budgets create fair comparisons. Winning budgets create controlled scale.
1
Testing budget
Budget per concept = total daily testing budget ÷ number of concepts. Daily floor per concept = product LTV ÷ 3.
| Example | Calculation |
|---|---|
| $90 LTV, four concepts | $30 minimum per concept; $120 minimum daily testing budget |
| $60 LTV, $80 available | $20 minimum per concept; test no more than four concepts |
If the budget cannot fund every concept at the floor, reduce the number of concepts. Do not starve every ad set.
2
Winning budget
- Give each winning concept its own ad-set budget.
- Budgets may differ based on CAC, conversion quality, scale, revenue, ROAS, and stability.
- Use conservative LTV from actual customer performance.
- The one-third-LTV rule is a daily floor, not a one-day decision rule.
Takeaway
Testing remains equal because the goal is comparison. Winning can differ because the goal is controlled scaling.